MV switchgear selection should begin with the network duty and operating plan, not with a cabinet name. AIS, GIS and RMU describe different aspects of a medium-voltage installation. Buyers should first confirm the single-line diagram, rated voltage, load current, short-circuit duty, protection, access and site conditions, then select an assembly and switching device that can meet the complete requirement.

Important distinction: AIS and GIS describe the insulation and construction approach. An RMU describes a compact ring-distribution function and arrangement; depending on the product, its insulation may use gas, air, solid dielectric or a combination. Do not treat “RMU” and “GIS” as interchangeable specifications.

Start with the system, not the switchgear catalogue

Before comparing equipment, freeze the electrical and operational inputs. IEC 62271-200 applies to prefabricated metal-enclosed AC switchgear assemblies above 1 kV and up to and including 52 kV, for service frequencies up to 60 Hz. The assembly standard works together with the common requirements in IEC 62271-1 and the relevant standards for devices such as circuit-breakers and switches.

A practical selection sequence is:

  1. Define the network duty. Confirm the system voltage, frequency, earthing arrangement, available fault current and protection clearing time.
  2. Define each functional unit. Identify incomers, bus sections, transformer feeders, motor feeders, metering, capacitor feeders and future panels.
  3. Choose the switching function. Decide where a circuit-breaker, switch-disconnector, contactor or fuse combination is required.
  4. Set the safety and continuity requirements. Specify internal-arc classification, accessibility, loss-of-service-continuity category and any partition class required by the project.
  5. Check the installation. Verify room layout, cable entry, access, pressure relief, altitude, ambient temperature, humidity, pollution and seismic requirements.
MV switchgear selection workflow from network duty through ratings, architecture, safety and project documentation
A defensible selection moves from network data to equipment ratings, architecture, safety classification and the final technical dossier.

AIS, GIS and RMU: what each term actually means

Term What it describes Typical reason to consider it Questions to confirm
AIS
Air-insulated switchgear
Air is the principal insulation medium around the primary conductors inside the assembly. Familiar construction, accessibility and configuration flexibility where sufficient floor space is available. Room size, clearances, environmental contamination, rear or front access, expansion space and maintenance plan.
GIS
Gas-insulated switchgear
Primary energized parts are contained in sealed gas-insulated compartments. The actual insulating gas or alternative technology must be stated. Compact footprint and reduced exposure of primary insulation to the surrounding environment. Insulation medium, sealed-system design, gas monitoring, end-of-life obligations, extension method and local regulations.
RMU
Ring main unit
A compact arrangement for secondary distribution, commonly combining ring switches with a transformer feeder or circuit-breaker function. Ring or radial distribution, compact substations, renewable collection networks and urban secondary distribution. Feeder configuration, extensibility, remote operation, protection type, cable test access and insulation technology.

Primary and secondary distribution duties should also be distinguished. A primary-distribution board may require higher bus current, higher short-circuit performance, withdrawable circuit-breakers and more extensive protection and metering. A secondary-distribution RMU is often optimized for compact ring operation and transformer protection. One cannot be substituted for the other from voltage class alone.

Technical comparison of air-insulated switchgear, gas-insulated switchgear and ring main unit concepts
AIS and GIS describe insulation construction; RMU describes a distribution function. The project must specify both the required function and the accepted technology.

The electrical ratings that must agree with the system study

Do not approve an offer from a nominal voltage and current alone. At minimum, compare the following values on the same standard basis:

  • Rated voltage (Ur): the switchgear rating must suit the system’s highest voltage for equipment, not only its everyday operating voltage.
  • Rated insulation level: check short-duration power-frequency withstand voltage and lightning-impulse withstand voltage against the project insulation coordination.
  • Rated normal current (Ir): state the required current for the main bus and each feeder. Consider ambient temperature, enclosure arrangement and future loading.
  • Rated short-time withstand current (Ik) and duration (tk): the kA value and time belong together. A 1-second and a 3-second rating are not the same duty.
  • Rated peak withstand current (Ip): confirm the peak mechanical duty associated with the project short-circuit condition.
  • Breaking and making duties: verify that the installed circuit-breaker, switch or fuse combination has the required duties for its actual function.
  • Frequency: state 50 Hz or 60 Hz. IEC 62271-200 covers service frequencies up to 60 Hz, but the offered assembly and devices still need the correct project rating.
Relationship between MV system study inputs and switchgear rated voltage, current, short-time withstand, peak withstand and switching duty
Every switchgear rating should trace back to a network study, load schedule, protection requirement or installation condition.

Internal arc classification is an installation condition, not a general badge

IEC 62271-200 defines internal arc classification (IAC) for metal-enclosed switchgear tested under specified conditions. The designation includes the accessibility type, accessible sides and arc test current and duration. Accessibility type A applies to switchgear installed in closed electrical service locations restricted to authorized personnel. The letters F, L and R identify the front, lateral and rear sides covered by the classification.

An IAC label must be read together with the exact assembly arrangement and installation instructions. Wall clearances, room height, pressure-relief ducts, ceiling strength and exhaust paths can affect whether the tested arrangement is reproduced on site. “Arc resistant” without the complete designation, current, duration and installation conditions is not sufficient for approval.

LSC describes what can remain energized during access

Loss of service continuity (LSC) classification describes the extent to which other high-voltage compartments or functional units may remain energized when an accessible high-voltage compartment is opened. In simplified terms:

  • LSC1: opening an accessible compartment requires a wider part of the switchgear to be taken out of service.
  • LSC2: at least one busbar set and the other functional units may remain energized.
  • LSC2A and LSC2B: when a compartment other than the connection compartment within a functional unit is accessible, these suffixes distinguish whether the cables associated with that unit must be de-energized.

The correct category follows the maintenance and operating philosophy. A higher category is not automatically valuable if the site cannot safely isolate, test and earth the relevant circuit or if the connected process does not require that continuity.

Protection, control and interlocking belong in the selection

The switchgear lineup is more than its main circuit. The technical schedule should define:

  • protection functions and relay model or approved functional equivalent;
  • CT and VT ratios, accuracy classes, burden and protection requirements;
  • trip and close supplies, battery system interface and supervision;
  • mechanical and electrical interlocks, including earthing-switch logic;
  • local/remote operation, mimic, indications and event records;
  • communications protocol, network architecture and time synchronization;
  • arc detection, pressure relief and remote racking or operation where required;
  • cable test facilities, phase indication and earthing provisions.

Interlocks should be reviewed against the intended operating sequence, not copied from a generic panel schedule. The purchaser should approve the single-line diagram, protection philosophy, control schematic and interlocking narrative together.

Site data can change the equipment choice

Include the actual service conditions in the RFQ. Altitude can affect external insulation and thermal performance. High ambient temperature can reduce current capability. Condensation, dust, salt, humidity and corrosive atmospheres may change the enclosure, heater, ventilation and insulation requirements. For indoor equipment, the room and pressure-relief path are part of the safety concept.

Also define whether the lineup must be front-access only, whether it will stand against a wall, the cable trench or top-entry arrangement, lifting restrictions, floor loading and the available route into the switch room. A technically compliant panel that cannot be installed or cabled in the building is not a workable selection.

MV switchgear RFQ checklist

For a comparable and technically reviewable quotation, provide:

  • single-line diagram and functional unit schedule;
  • system nominal voltage, highest voltage for equipment and 50/60 Hz frequency;
  • system earthing method and neutral arrangement;
  • busbar and feeder normal-current requirements;
  • short-circuit current, peak basis and required duration;
  • switching duties for transformers, motors, capacitors, cables and generators;
  • required IEC edition and any utility or project deviations;
  • IAC designation and installation arrangement;
  • LSC and partition requirements;
  • protection, metering, control power and communication requirements;
  • indoor/outdoor conditions, altitude, ambient limits, pollution and seismic data;
  • room layout, access sides, cable entry and pressure-relief route;
  • required routine/type-test evidence, FAT scope and final documentation.

Practical conclusion: select MV switchgear as a complete system interface. The correct result combines network ratings, switching function, insulation technology, service continuity, internal-arc performance, control architecture and site conditions. Comparing cabinet names or headline ratings alone leaves important project risks unresolved.

Technical references